Exterior painting is protection first. Color second.
In Florida, sun and salt and humidity fight the wall every day. We pressure-wash the whole exterior, repair every crack and soft spot, prime the bare surface, then paint in two full coats — not a rush job between two afternoon storms.
A house that reads clean from the street. Color that holds through hurricane season. No peeling around the soffits in year two. No fading on the sun-side by year four.
Map every surface. Flag every crack, soft stucco, soffit gap, or previous bad patch. You see full scope before you sign.
Full exterior. Dirt, mildew, chalking paint — all off. Wall dries 24–48 hours before we touch it.
Stucco cracks cut and re-patched. Soffit gaps sealed. Soft drywall on lanai ceilings replaced, not painted over.
Every repair, every bare spot, every color-change boundary. The primer locks the paint to the wall.
Right sheen for the surface. Right roller or sprayer for the texture. Clean edges on trim, windows, and fascia.
Touch-ups. Trim fine work. Site left the way we found it.
Single-family home in Broward: 3–5 working days, weather permitting.
Larger homes or HOA repaint: 5–7 days.
We don't promise one-day exterior jobs. Real prep takes real time.
Bring us the house. We'll walk every wall and tell you what it needs before we tell you what it costs.
Request a walk-throughOr call: {PENDING-A2}